From needs to cards
Capture user needs and requirements, track draft, approved, and obsolete states, and link them to backlog cards.
Traceability
For teams that need design controls. Connect needs, requirements, cards, verification, and risks so the trail is always current.
Why it helps
Capture user needs and requirements, track draft, approved, and obsolete states, and link them to backlog cards.
Record verification or validation by test, inspection, analysis, or demonstration, from planned to passed or failed, with history.
Follow hazard, hazardous situation, and harm, rate severity and probability before and after controls, and link the requirements that control each risk.
Capabilities
User needs and requirements with status and history.
Trace each requirement to the backlog cards that deliver it.
Planned, passed, or failed, by method.
Show that the finished work meets the user need.
Ratings before and after controls, controlled by requirements.
Track the count as an insight on the dashboard.
Works with
Start a workspace and link your first requirement.
Create workspace